American Woodworker
Contact Us | Help | Report a Bug
Sign in | Join
 

Gluing and Clamping Louisburg KS

Clamp caddy works great and it's simple to make. The following article has some tips to offer to help you build your own clamp caddy. Here you will discover how to build your own clamp caddy for convenient use on woodworking projects. Also find competitive pricing on all wood glue, wood gluing clamp tools, woodworking pipe clamps and more at the hardware supply stores in Louisburg, KS listed below.

The Home Depot
(816)322-2531
1306 E North Avenue
Belton, MO
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

The Home Depot
(913)851-9961
8000 W 135th Street
Overland Park, KS
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

Potts' Hardware & Home Center
(816) 657-2022
120 E Main
Drexel, MO
 
Paola Do it Best Hardware
(913) 294-4044
104 W Piankishaw
Paola, KS
 
Belton - Auth Hometown
(816) 331-1747
1153 E North Ave
Belton, MO
Store Hours
Hometown Dealers
Store Type
Hometown Dealers
Hours
Mon:9-19
Tue:9-19
Wed:9-19
Thu:9-19
Fri:9-19
Sat:9-18
Sun:11-16
Store Features
Mon:9-19
Tue:9-19
Wed:9-19
Thu:9-19
Fri:9-19
Sat:9-18
Sun:11-16

The Home Depot
(913)780-6933
20025 W 154th Street
Olathe, KS
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

Mossman True Value Lbr
(913) 837-2955
27295 Metcalf Rd
Louisburg, KS
 
Farmers Union Cooperative
(913) 592-2339
110 South Frank
Spring Hill, KS
 
Westlake Ace Hardware
(816) 331-9277
North Cass Shpg Ctr, 58 Hwy & 71 Hwy
Belton, MO
 
LOWE'S OF OLATHE, KAN.
913 397-7070
13750 SOUTH BLACKBOB RD. OLATHE, KS, 66062
Olathe, KS
 

Gluing and Clamping

Clamp Caddy



Clamp Caddy

Maneuvering pipe clamps around my shop was a pain until I dreamed upthis mobile carryall. It even has room for all of my C-clamps, handscrews and small adjustable clamps. I got everything I needed to makeit from a home center for about $60.

Build It
1.    Glue two pieces of 3/4-in. plywood to make the base.
2.    Attach the corner blocks and mount the clamp shelves.
3.    Lag-screw a 5-gal. bucket to the base.
4.    Install heavy-duty swivel casters.
5.    Bandsaw two 11-1/4-in.-dia. plywood disks. You may have to adjust the disks' diameters to fit your bucket.
       The disks should seat about 1 in. below the top rim.
6.    Fasten the disks together; then lay out and drill 2-in.-dia. holes for the clamp tubes.
7.    Bandsaw one disk to a 10-3/8-in. diameter so it will seat about 2 in. above the bottom of the bucket.
8.    Make the clamp tubes by cutting PVC pipe to length.
9.    Install the disks with polyurethane construction adhesive. Make sure the clamp-tube holes are aligned.
10.    Install the clamp tubes.

Click here to read the rest of the article from American Woodworker