American Woodworker
Contact Us | Help | Report a Bug
Sign in | Join
 

Gluing and Clamping West Fargo ND

Clamp caddy works great and it's simple to make. The following article has some tips to offer to help you build your own clamp caddy. Here you will discover how to build your own clamp caddy for convenient use on woodworking projects. Also find competitive pricing on all wood glue, wood gluing clamp tools, woodworking pipe clamps and more at the hardware supply stores in West Fargo, ND listed below.

The Home Depot
(701)282-2078
4700 17th Avenue SW
Fargo, ND
Hours
Mon-Sat: 6:00am-9:00pm
Sun: 12:00pm-8:00pm

Lamperts
(701) 492-0292
4115 32nd Ave Sw
Fargo, ND
 
Simonson Lumber & Hdw True Value
(701) 232-3281
2400 Main Ave
Fargo, ND
 
West Acres Regional S/C
(701) 281-5800
3902 13Th Ave South Ste 600
Fargo, ND
Store Hours
Sears Stores
Store Type
Sears Stores
Hours
Mon:10-21
Tue:10-21
Wed:10-21
Thu:10-21
Fri:10-21
Sat:10-21
Sun:12-18
Store Features
Mon:10-21
Tue:10-21
Wed:10-21
Thu:10-21
Fri:10-21
Sat:10-21
Sun:12-18

LOWE'S OF FARGO, ND
701 433-2160
5001 13TH AVENUE SW FARGO, ND, 58103
Fargo, ND
 
Ostrom's Hardware
(701) 282-3046
1100 13th Ave E Ste 2, 9th St and 13th Ave E
West Fargo, ND
 
Nodak Stores
(701) 293-1155
3515 W Main Ave
Fargo, ND
 
Fastenal- Fargo
701-277-0823
3215 Main Ave Suite A Fargo, ND, 58102
Fargo, ND
 
Fastenal- Fargo
701-271-1055
3239 15th St S Suite A Fargo, ND, 58106
Fargo, ND
 
Scheels Ace Hardware
(701) 232-8903
3202-13th Ave S
Fargo, ND
 

Gluing and Clamping

Clamp Caddy



Clamp Caddy

Maneuvering pipe clamps around my shop was a pain until I dreamed upthis mobile carryall. It even has room for all of my C-clamps, handscrews and small adjustable clamps. I got everything I needed to makeit from a home center for about $60.

Build It
1.    Glue two pieces of 3/4-in. plywood to make the base.
2.    Attach the corner blocks and mount the clamp shelves.
3.    Lag-screw a 5-gal. bucket to the base.
4.    Install heavy-duty swivel casters.
5.    Bandsaw two 11-1/4-in.-dia. plywood disks. You may have to adjust the disks' diameters to fit your bucket.
       The disks should seat about 1 in. below the top rim.
6.    Fasten the disks together; then lay out and drill 2-in.-dia. holes for the clamp tubes.
7.    Bandsaw one disk to a 10-3/8-in. diameter so it will seat about 2 in. above the bottom of the bucket.
8.    Make the clamp tubes by cutting PVC pipe to length.
9.    Install the disks with polyurethane construction adhesive. Make sure the clamp-tube holes are aligned.
10.    Install the clamp tubes.

Click here to read the rest of the article from American Woodworker