American Woodworker
Contact Us | Help | Report a Bug
Sign in | Join
 

Gluing and Clamping Westerly RI

Clamp caddy works great and it's simple to make. The following article has some tips to offer to help you build your own clamp caddy. Here you will discover how to build your own clamp caddy for convenient use on woodworking projects. Also find competitive pricing on all wood glue, wood gluing clamp tools, woodworking pipe clamps and more at the hardware supply stores in Westerly, RI listed below.

The Home Depot
(401)596-4440
120 Franklin St
Westerly, RI
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

The Home Depot
(860)848-9217
1932 Norwich-New London
Uncasville, CT
Hours
Mon-Sat: 6:00am-9:00pm
Sun: 8:00am-7:00pm

The Home Depot
(860)376-2047
142 River Road
Lisbon, CT
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

Hanley & Williams Lumber Co.
(401) 596-2806
124 Oak Street
Westerly, RI
 
Cash True Value Home Center
(860) 536-9601
9 Hendel Dr
Mystic, CT
 
Liberty Cedar, Inc.
(401) 789-6626
325 Liberty Lane
West Kingston, RI

Data Provided by:
The Home Depot
(860)437-1900
816 Hartford Turnpike
Waterford, CT
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

GK Woodworking LLC (Monthly Specials - see below)
(860) 608-7514
56 Browning Rd
Griswold, CT

Data Provided by:
Mcquade's Ace Hardware
(401) 596-0302
105 Franklin St
Westerly, RI
 
Holdridge True Value Hardware & H&gs
(860) 464-8400
749 Route 117
Ledyard, CT
 
Data Provided by:

Gluing and Clamping

Clamp Caddy



Clamp Caddy

Maneuvering pipe clamps around my shop was a pain until I dreamed upthis mobile carryall. It even has room for all of my C-clamps, handscrews and small adjustable clamps. I got everything I needed to makeit from a home center for about $60.

Build It
1.    Glue two pieces of 3/4-in. plywood to make the base.
2.    Attach the corner blocks and mount the clamp shelves.
3.    Lag-screw a 5-gal. bucket to the base.
4.    Install heavy-duty swivel casters.
5.    Bandsaw two 11-1/4-in.-dia. plywood disks. You may have to adjust the disks' diameters to fit your bucket.
       The disks should seat about 1 in. below the top rim.
6.    Fasten the disks together; then lay out and drill 2-in.-dia. holes for the clamp tubes.
7.    Bandsaw one disk to a 10-3/8-in. diameter so it will seat about 2 in. above the bottom of the bucket.
8.    Make the clamp tubes by cutting PVC pipe to length.
9.    Install the disks with polyurethane construction adhesive. Make sure the clamp-tube holes are aligned.
10.    Install the clamp tubes.

Click here to read the rest of the article from American Woodworker