American Woodworker
Contact Us | Help | Report a Bug
Sign in | Join
 

Cabinetry Sayville NY

Here you will learn a technique on how to create frameless cabinet joinery. Cabinetry will open up a new avenue for creativity and you will find yourself building many useful woodworking projects. Make sure you have the right power tools when cabinet making. You will find everything you need at the hardware supply stores in Sayville, NY listed below.

The Home Depot
(631)234-2670
301 South Research Place
Central Islip, NY
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

The Home Depot
(631)286-0210
20 Farber Drive
Bellport, NY
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

The Home Depot
(631)732-9200
401 Independence Plaza
Selden, NY
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

The Home Depot
(631)395-3764
399 William Floyd Pkwy
Shirley, NY
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

The Home Depot
(631)242-0215
475 Commack Road
Deer Park, NY
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

The Home Depot
(631)666-3800
1881 Sunrise Hwy
Bay Shore, NY
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

The Home Depot
(631)286-4665
10 Gateway Blvd
Patchogue, NY
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

The Home Depot
(631)580-7849
255 Pond Path
South Setauket, NY
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

The Home Depot
(631)451-0685
346 Middle Country Rd
Coram, NY
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

Roberts Plywood Co.
(800) 422-4944
45 North Industry Court
Deer Park, NY

Data Provided by:
Data Provided by:

Cabinetry

Frameless Cabinet Joinery

By Dave Munkittrick

I’ve always liked the clean, modern look of cabinets built without face frames. My early attempts involved building plywood boxes first and applying hardwood edging later. But cutting, fitting, gluing and clamping each edging piece was frustratingly slow --- and that was nothing compared to leveling the edging flush with the plywood. A task that was especially aggravating on the inside corners. 

I had almost given up making this style of cabinet when I learned a new technique that streamlines construction. It allows you to put the edging on before assembly. Flushing up the edging on a flat panel is no problem. I can even pre-finish the cabinet parts before gluing them together. I get perfect looking butt joints and an almost invisible line where the edging joins the plywood (see photo below). 

Here’s how it works:

1. Cut all your cabinet parts to size. Leave one shelf about 1/2-in. long to use later for test cuts. 

2. Cut all the rabbets and dadoes (Photo 1). Because this technique requires consistent dado depth I prefer to use a router and a jig rather than a tablesaw. For more on the jig we used.

3. Glue the hardwood edges to the side panels and shelves by sandwiching a single piece of hardwood between two panels (Photo 2). The hardwood piece is twice as thick as the finish thickness of the edging plus an extra 1/8-in. for the saw kerf. For example, for a 3/16-in. thick hardwood edge use a 1/2-in. thick piece of hardwood. I like the looks of a thin edge and it still offers plenty of protection for the plywood edge. 

4. Rip the glued-together panels (Photo 3). The hardwood edge  creates stopped dados and rabbets on the cabinet sides. 

5. Flush up the edging with the panels. I start with a block plane (Photo 4) and finish with a light sanding. Using a power sander is asking for a sand-through on the veneer. 

6. Trim the edging to length with a handsaw.

7. Use the extra long shelf to set your jointer for notching the plywood (Photo 5). It’ll take some trial and error to get the depth of cut just right. The extra length on the shelf allows you to trim and retest the joints’ fit.

8. Test the shelf’s fit by sliding it forward in the rabbet (Photo 6). If the notched edge butts into the back of the side’s edging, the cut needs to be made deeper. If the notch slides over the side’s edging and leaves a gap, the jointer needs to be set for a shallower cut. 

9. Once you get the right fit, go ahead and notch all the shelves. 

10. Dry fit the cabinet to check for any problem areas. An open joint is almost always the result of a high spot in a dado. 

11. Do any finish sanding on the edges while the cabinet is clamped together. It’s too easy to ruin the fit if you sand the edging when the cabinet is apart.

12. Disassemble the  cabinet and finish sand the flat panels taking care not to round ...

Click here to read the rest of the article from American Woodworker