American Woodworker
Contact Us | Help | Report a Bug
Sign in | Join
 
» » »

Long-Reach Stop for Crosscut Sled Edison NJ

T-track makes the stop easy to install and adjust. When the stopisn't necessary, tightening the knobs draws the bolts into thecounterbored holes, so they don't protrude.

The Home Depot
(908)222-7700
1515 Route 22
Watchung, NJ
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

The Home Depot
(908)252-0101
736 Route 202 South
Bridgewater, NJ
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

The Home Depot
(718)273-5069
2501 Forest Ave
Staten Island, NY
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

The Home Depot
(973) 848-0600
399-443 Springfield Ave
Newark, NJ
 
The Home Depot
(609)987-8686
701 Nassau Park Blvd
Princeton, NJ
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

The Home Depot
(732)438-5980
4095 US Route 1
Monmouth Junction, NJ
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

AGINCOURT
(908) 874-8234
212 E Mountain Rd
Hillsborough, NJ

Data Provided by:
The Home Depot
(718)818-9334
545 Targee Street
Staten Island, NY
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

The Home Depot
(973)848-0600
399-443 Springfield Ave
Newark, NJ
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

Boro Hardware & Paint Co
(732) 548-3974
655 Middlesex Ave
Metuchen, NJ
 
Data Provided by:

Long-Reach Stop for Crosscut Sled

Long-Reach Stop for Crosscut Sled



I built the “Ultimate Crosscut Sled” featured in AW #75 (October 1999).It works great, and recently I've added an adjustable stop, which makesit even better. I thought other AW readers would be interested in myupgrade. My 50-in.-capacity stop consists of scrap wood, a 48-in.length of
T-track (I used Mini Track from www.prairieriverwoodworking.com),1/4-20 hex-head bolts and a couple of plastic knobs. I spent less than$25. My stop makes repetitive crosscutting of long stock—shelves for abookcase, for instance—a breeze. Any hardwood will do for the rail andstop; I used a 7/8-in. x 2-in. x 60-in. piece of hickory. You canincrease the crosscut capacity by using a longer rail. I cut a stoppeddado in the back of the rail to house the T-track, which I installedwith screws. I attached the stop to the end of the rail with a gluedhalf-lap joint. I counterbored a pair of holes in the sled's fence andinstalled the bolts and knobs.

T-track makes the stop easy to install and adjust. When the stopisn't necessary, tightening the knobs draws the bolts into thecounterbored holes, so they don't protrude.

Click here to read the rest of the article from American Woodworker

Local Events

Philadelphia Flower Show 2018
Dates: 3/4/2018 – 3/11/2018
Location:
Pennsylvania Convention Center Philadelphia
View Details