American Woodworker
Contact Us | Help | Report a Bug
Sign in | Join
 
» » »

Rollers Ease Plywood Storage Portales NM

Plywood storage roller works great and it's simple to make. The following article has some tips to offer to help you build your own storage roller. So read on to get more details below.

Portales Ace Hardware
(575) 356-6711
227 S Main Ave
Portales, NM
 
Lowe's
(575) 742-4000
3601 North Prince Street
Clovis, NM
Hours
M-SA 7 am - 9 pm
SU 9 am - 8 pm

Hacienda Home Centers
(575) 769-2651
200 East Brady Avenue
Clovis, NM
 
Burns Hardware Do it center
(575) 769-2528
1511 N Prince St
Clovis, NM
 
Triangle Ace Hardware
(575) 762-3301
2400 N Prince St, North plains mall
Clovis, NM
 
PGP, Inc.
505-762-6654
1729 W. 21st Clovis, NM, 88101
Clovis, NM
 
LOWE'S OF CLOVIS, NM
505 742-4000
3601 NORTH PRINCE STREET CLOVIS, NM, 88101
Clovis, NM
 
Furrow's Home Lumber Inc.
(575) 763-4437
1201 E 1st Street
Clovis, NM
 
North Plains Mall
(575) 769-4700
2811 N Prince St
Clovis, NM
Store Hours
Sears Stores
Store Type
Sears Stores
Hours
Mon:10-21
Tue:10-21
Wed:10-21
Thu:10-21
Fri:10-21
Sat:10-21
Sun:12-18
Store Features
Mon:10-21
Tue:10-21
Wed:10-21
Thu:10-21
Fri:10-21
Sat:10-21
Sun:12-18

Fastenal- Clovis
505-763-9335
1306 State Rd. 209 Clovis, NM, 88101
Clovis, NM
 

Rollers Ease Plywood Storage

Rollers Ease Plywood Storage

Before I installed these rollers, sliding plywood in and out of my storage rack used to wear me out. It also damaged the edges of the sheets. Now plywood sheets glide in and out.I cut the 2-1/2-in.-dia. rollers from 3/4-in. hard maple on my drill press using a fly cutter. You could also cut them on a bandsaw with a circle-cutting jig. I drilled out the centers to 17/32 in., so they would spin on the 1/2-in. hex-head bolts I use as spindles.My rack consists of four evenly spaced blocks attached to uprights and a 4-in.-wide x 6-ft.-long solid-wood backboard. The backboard is screwed tothe wall; the uprights fasten to a board mounted on the ceiling.

Before assembling the rack, I laid out and drilled holes in the uprights and backboard for the hex-head bolts. I counterbored the backboard’s holes for the 1/2-in. nuts that the 7-in.-long bolts screw into. After screwing the blocks to the backboard and installing the nuts, I screwed the assembly to the wall. Then I screwed each upright to the block on the floor and the board on the ceiling. Installing the rollers and their 1/2-in. washer spacers was the last step. I slid them onto the bolts before screwing the bolts into the backboard’s housed nuts.

Click here to read the rest of the article from American Woodworker