American Woodworker
Contact Us | Help | Report a Bug
Sign in | Join
 

Rollers Ease Plywood Storage Tahlequah OK

Plywood storage roller works great and it's simple to make. The following article has some tips to offer to help you build your own storage roller. So read on to get more details below.

Masters True Value Hardware
(918) 456-4122
128 N Muskogee Ave
Tahlequah, OK
 
1404 S Muskogee Ave
(918) 431-1717
Ste #7
Tahlequah, OK
Store Hours
Hometown Dealers
Store Type
Hometown Dealers
Hours
Mon:9-18
Tue:9-18
Wed:9-18
Thu:9-18
Fri:9-18
Sat:9-18
Sun:13-18
Store Features
Mon:9-18
Tue:9-18
Wed:9-18
Thu:9-18
Fri:9-18
Sat:9-18
Sun:13-18

Lowe's
(918) 708-4000
161 Meadow Creek Drive
Tahlequah, OK
Hours
M-SA 7 am - 9 pm
SU 8 am - 7 pm

Masters True Value Hardware
(800) 642-7392
128 N Muskogee Ave
Tahlequah, OK

Data Provided by:
The Home Depot
(405)773-6077
7620 NW Expressway
Oklahoma City, OK
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

LOWE'S OF TAHLEQUAH, OK
918 708-4000
161 MEADOW CREEK DRIVE TAHLEQUAH, OK, 74464
Tahlequah, OK
 
Tahlequah Lumber
(918) 456-2506
1701 Park Hill Road
Tahlequah, OK
 
Keith True Value
(918) 478-2327
911 S Lee
Fort Gibson, OK
 
The Home Depot
(405)895-6064
650 SW 19th Street
Moore, OK
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

The Home Depot
(405)749-1590
14201 N Pennsylvania Ave
Oklahoma City, OK
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

Data Provided by:

Rollers Ease Plywood Storage

Rollers Ease Plywood Storage

Before I installed these rollers, sliding plywood in and out of my storage rack used to wear me out. It also damaged the edges of the sheets. Now plywood sheets glide in and out.I cut the 2-1/2-in.-dia. rollers from 3/4-in. hard maple on my drill press using a fly cutter. You could also cut them on a bandsaw with a circle-cutting jig. I drilled out the centers to 17/32 in., so they would spin on the 1/2-in. hex-head bolts I use as spindles.My rack consists of four evenly spaced blocks attached to uprights and a 4-in.-wide x 6-ft.-long solid-wood backboard. The backboard is screwed tothe wall; the uprights fasten to a board mounted on the ceiling.

Before assembling the rack, I laid out and drilled holes in the uprights and backboard for the hex-head bolts. I counterbored the backboard’s holes for the 1/2-in. nuts that the 7-in.-long bolts screw into. After screwing the blocks to the backboard and installing the nuts, I screwed the assembly to the wall. Then I screwed each upright to the block on the floor and the board on the ceiling. Installing the rollers and their 1/2-in. washer spacers was the last step. I slid them onto the bolts before screwing the bolts into the backboard’s housed nuts.

Click here to read the rest of the article from American Woodworker