American Woodworker
Contact Us | Help | Report a Bug
Sign in | Join
 

Woodworking Shows Nashua NH

Using a 3/16-in. slot-cutting bit, rout grooves for splines in all the stiles and rails (Photo 2, Fig. A, Parts F1-F3 and S1-S4). All the grooves have the same offset, a 5/16-in. lip at the front and a 1/4-in. lip at the back (Fig. A, Detail 3). The front frame stiles (F1) and the front side frame stiles (S1) receive two slots.

Rockler Woodworking and Hardware #34
(603) 898-5941
373 S. Broadway
Salem, NH

Data Provided by:
Woodery Lumber Company
(978) 342-9293
110 Pleasant St
Lunenburg, MA

Data Provided by:
Pheasant Ln Mall
(603) 891-6200
310 Daniel Webster Hwy Ste 102
Nashua, NH
Store Hours
Sears Stores
Store Type
Sears Stores
Hours
Mon:10-21
Tue:10-21
Wed:10-21
Thu:10-21
Fri:10-21
Sat:8-21
Sun:10-18.5
Store Features
Mon:10-21
Tue:10-21
Wed:10-21
Thu:10-21
Fri:10-21
Sat:8-21
Sun:10-18.5

Lowe's
(603) 521-9950
143 Daniel Webster Highway
Nashua, NH
Hours
M-SA 6 am - 10 pm
SU 8 am - 8 pm

Lorden True Value Hdwe
(978) 433-2348
53 Main St
Pepperell, MA
 
New England Hardwood Supply Company, Inc.
(978) 486-8683
100 Taylor StPO Box 2254
Littleton, MA

Data Provided by:
Artisan Lumber, Inc.
(781) 431-1500
35 Leominster Road
Lunenburg, MA

Data Provided by:
Nashua - B
(603) 324-0800
375 Amherst St
Nashua, NH
Store Hours
Sears Stores
Store Type
Sears Stores
Hours
Mon:9-21
Tue:9-21
Wed:9-21
Thu:9-21
Fri:9-21
Sat:9-21
Sun:10-18
Store Features
Mon:9-21
Tue:9-21
Wed:9-21
Thu:9-21
Fri:9-21
Sat:9-21
Sun:10-18

Hudson True Value Hdw.
(603) 883-3100
114 Derry Road
Hudson, NH
 
Bridge Street True Value
(603) 635-1521
122 Bridge St
Pelham, NH
 
Data Provided by:

Showcase

Showcase

View your treasures from every angle.

by Luke Hartle

Download the PDF.

Any collection you want to display, from fish fossils to Baccarat crystal will look great inside this cabinet. It allows unobstructed viewing from the front because the doors are on the sides. The doors themselves are frameless glass to maximize the side views. Inside, the mirrored back presents views from still another perspective, and glass shelves allow the built-in lighting to filter throughout the cabinet.

This showcase features 12-in.-deep shelves, graceful proportions and slender stiles and rails that elegantly frame the display area. It’s built with spline joinery that’s both simple and strong. I made the crown molding with new dedicated router bits that do an impressive job. 

Glass is easily the most expensive component of this project—I spent about $625, including $40 to bevel the arched front panel. This piece and the side doors are tempered glass, for safety. The seven glass shelves aren’t tempered. The cabinet requires only 25 bd. ft. of 4/4 lumber, so I splurged on genuine mahogany. My total cost, including the hardware and lighting, was about $1000. 

Build The Frames

The cabinet’s basic structure consists of three frames joined together. The frames and the cabinet must all be square so the glass will fit.

1. Rip the boards for the frame stiles about 1/4-in. oversize in width (Photo 1). To prevent headaches when installing the glass it’s important for all the stiles to be straight and flat. Let these pieces sit overnight to stabilize.  Then joint and gang-plane them to final width. 

Photo 1: Start by cutting the stiles for the three frames that form the cabinet. Rip these pieces oversize in width. The extra width allows you to straighten pieces that develop a crook.

2.   Using a 3/16-in. slot-cutting bit, rout grooves for splines in all the stiles and rails (Photo 2, Fig. A, Parts F1-F3 and S1-S4). All the grooves have the same offset, a 5/16-in. lip at the front and a 1/4-in. lip at the back (Fig. A, Detail 3). The front frame stiles (F1) and the front side frame stiles (S1) receive two slots.  

Photo 2: Rout grooves for splines in the stiles and rails. Most of the stiles have more than one groove. All the grooves are routed from the same setting. 

3. Cut the arch on the front frame top rail (F2) and sand it smooth.

4.   Cut the splines (F4) by ripping pieces slightly oversize in thickness and then planing them to fit the grooves. 

5.   Assemble the front and side frames. After the glue is dry, trim flush any splines that protrude.  

6.   Rout rabbets in the frames for the glass (Photo 3 and Fig. A, Detail 3).  The rabbets go on the back of the front frame and on the front of the side frames. The spline grooves that you’ve routed automatically define the depths of all the rabbets.

Click here to read the rest of the article from American Woodworker