American Woodworker
Contact Us | Help | Report a Bug
Sign in | Join
 

Woodworking Shows Saint Cloud MN

Using a 3/16-in. slot-cutting bit, rout grooves for splines in all the stiles and rails (Photo 2, Fig. A, Parts F1-F3 and S1-S4). All the grooves have the same offset, a 5/16-in. lip at the front and a 1/4-in. lip at the back (Fig. A, Detail 3). The front frame stiles (F1) and the front side frame stiles (S1) receive two slots.

The Home Depot
(320)252-3262
401 2nd Street South
Waite Park, MN
Hours
Mon-Sat: 6:00am-9:00pm
Sun: 8:00am-8:00pm

Crossroads Ctr
(320) 202-6000
4101 W Division St
Saint Cloud, MN
Store Hours
Sears Stores
Store Type
Sears Stores
Hours
Mon:10-21
Tue:10-21
Wed:10-21
Thu:10-21
Fri:10-21
Sat:10-21
Sun:11-18
Store Features
Mon:10-21
Tue:10-21
Wed:10-21
Thu:10-21
Fri:10-21
Sat:10-21
Sun:11-18

Kmart 4882 / Cross Merch
(320) 251-3343
40 2Nd St S
Waite Park, MN
Store Hours
Miscellaneous
Store Type
Miscellaneous
Hours
Monday To Friday Working Hours is :8-22 and for Sat:8-22
Sun:8-21
Store Features
Monday To Friday Working Hours is :8-22 and for Sat:8-22
Sun:8-21

Denny & Kathy's Ace Hardware
(320) 253-0370
2006 8th St N
Saint Cloud, MN
 
Mimbach Fleet Supply
(320) 252-1682
3355 Quail Rd NE, Arnold's IH Equipment
Sauk Rapids, MN
 
Denny & Kathy's Ace Hardware
(320) 258-4044
3123 Roosevelt Rd, Located near St. Cloud Medical Group South Campus
Saint Cloud, MN
 
Fastenal- St. Cloud
320-252-3655
2803 Clearwater Rd St. Cloud, MN, 56301
St. Cloud, MN
 
Thomas Tool- St. Cloud
(320) 253-4526
1201 Lincoln Avenue NE St Cloud, MN, 56302
St Cloud, MN
 
Simonson Lumber
(320) 252-9385
2455 12th St S.e.
St Cloud, MN
 
Fastenal- Sauk Rapids
320-253-4544
1000 Benton Drive S Suite 411 Sauk Rapids, MN, 56379
Sauk Rapids, MN
 

Showcase

Showcase

View your treasures from every angle.

by Luke Hartle

Download the PDF.

Any collection you want to display, from fish fossils to Baccarat crystal will look great inside this cabinet. It allows unobstructed viewing from the front because the doors are on the sides. The doors themselves are frameless glass to maximize the side views. Inside, the mirrored back presents views from still another perspective, and glass shelves allow the built-in lighting to filter throughout the cabinet.

This showcase features 12-in.-deep shelves, graceful proportions and slender stiles and rails that elegantly frame the display area. It’s built with spline joinery that’s both simple and strong. I made the crown molding with new dedicated router bits that do an impressive job. 

Glass is easily the most expensive component of this project—I spent about $625, including $40 to bevel the arched front panel. This piece and the side doors are tempered glass, for safety. The seven glass shelves aren’t tempered. The cabinet requires only 25 bd. ft. of 4/4 lumber, so I splurged on genuine mahogany. My total cost, including the hardware and lighting, was about $1000. 

Build The Frames

The cabinet’s basic structure consists of three frames joined together. The frames and the cabinet must all be square so the glass will fit.

1. Rip the boards for the frame stiles about 1/4-in. oversize in width (Photo 1). To prevent headaches when installing the glass it’s important for all the stiles to be straight and flat. Let these pieces sit overnight to stabilize.  Then joint and gang-plane them to final width. 

Photo 1: Start by cutting the stiles for the three frames that form the cabinet. Rip these pieces oversize in width. The extra width allows you to straighten pieces that develop a crook.

2.   Using a 3/16-in. slot-cutting bit, rout grooves for splines in all the stiles and rails (Photo 2, Fig. A, Parts F1-F3 and S1-S4). All the grooves have the same offset, a 5/16-in. lip at the front and a 1/4-in. lip at the back (Fig. A, Detail 3). The front frame stiles (F1) and the front side frame stiles (S1) receive two slots.  

Photo 2: Rout grooves for splines in the stiles and rails. Most of the stiles have more than one groove. All the grooves are routed from the same setting. 

3. Cut the arch on the front frame top rail (F2) and sand it smooth.

4.   Cut the splines (F4) by ripping pieces slightly oversize in thickness and then planing them to fit the grooves. 

5.   Assemble the front and side frames. After the glue is dry, trim flush any splines that protrude.  

6.   Rout rabbets in the frames for the glass (Photo 3 and Fig. A, Detail 3).  The rabbets go on the back of the front frame and on the front of the side frames. The spline grooves that you’ve routed automatically define the depths of all the rabbets.

Click here to read the rest of the article from American Woodworker