American Woodworker
Contact Us | Help | Report a Bug
Sign in | Join
 
» » »

Swingin' Storage Gaston SC

To install a panel, insert the longer dowel in the top tool holder until the bottom;dowel;slips into the bottom tool holder. The long top dowel; must extend through both rings of the tool holder to keep the panel from falling out.

Paulownia Barn, LLC
(803) 381-8735
405 Hydrick Road
Swansea, SC

Data Provided by:
The Home Depot
(803)781-0877
5200 Fernandina Rd
Columbia, SC
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

Fastenal- West Columbia
803-356-4334
3914 Platt Springs Road West Columbia, SC, 29170
West Columbia, SC
 
Lowe's
(803) 808-5460
5570 Platt Springs Road
Lexington, SC
Hours
M-TH 7 am - 9 pm
FRI-SA 7 am - 10 pm
SU 1:30-7 pm

Ace Hardware of Cayce LLC
(803) 391-4223
815 State St, Parkland Plaza / Bi-Lo Shopping Center
Cayce, SC
 
The Home Depot
(803)359-1194
5600 Sun Set Blvd
Lexington, SC
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 1:30pm-8:00pm

Three Fountains Ace Hardware
(803) 957-4991
2930 Emanuel Church Rd
West Columbia, SC
 
LOWE'S OF WEST COLUMBIA, S. C.
803 926-8885
2829 AUGUSTA RD WEST COLUMBIA, SC, 29170
West Columbia, SC
 
Lowe's
(803) 926-8885
2829 Augusta Road
West Columbia, SC
Hours
M-SA 6 am - 10 pm
SU 1:30-8 pm

West Columbia - D
(803) 794-9150
1500 Charleston Hwy
West Columbia, SC
Store Hours
Miscellaneous
Store Type
Miscellaneous
Hours
Mon:8-22
Tue:8-22
Wed:8-22
Thu:8-22
Fri:8-22
Sat:8-22
Sun:8-21
Store Features
Mon:8-22
Tue:8-22
Wed:8-22
Thu:8-22
Fri:8-22
Sat:8-22
Sun:8-21

Data Provided by:

Swingin' Storage

Swingin' Storage



I like to store hardware in its original package on a Peg-Board wall in my shop. I've devised some swinging panels for the wall that give me a lot more usable space. To make the panels, you'll need 1/8" Peg-Board, a 3/4" dia. dowel rod, and Peg-Board tool holders.

Make the panels by cutting 12" x 12" pieces from the Peg-Board. For each panel, cut one dowel 2-1/2" long and one 5" long. Cut a 1/8" wide groove in one end of both dowels and slide the dowels onto the panels. Fasten the dowels with screws. 


To install a panel, insert the longer dowel in the top tool holder until the bottom dowel slips into the bottom tool holder. The long top dowel must extend through both rings of the tool holder to keep the panel from falling out. Each pair of tool holders holds up to six panels. 

I also cut a 1/8" wide slot in a 12" length of 2x4 to use as a base for the panels so I can remove a panel from the tool rack and set it on my workbench.

--Mark Thiel



Click here to read the rest of the article from American Woodworker