American Woodworker
Contact Us | Help | Report a Bug
Sign in | Join
 

Swingin' Storage Huntington WV

To install a panel, insert the longer dowel in the top tool holder until the bottom;dowel;slips into the bottom tool holder. The long top dowel; must extend through both rings of the tool holder to keep the panel from falling out.

The Home Depot
(304)733-8201
1050 Thundering Herd Dr
Barboursville, WV
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

Kmart 3425 / Cross Merch
(304) 736-2844
5636 Us Route 60 E
Huntington, WV
Store Hours
Miscellaneous
Store Type
Miscellaneous
Hours
Monday To Friday Working Hours is :8-22 and for Sat:8-22
Sun:8-21
Store Features
Monday To Friday Working Hours is :8-22 and for Sat:8-22
Sun:8-21

Kenova Box Company
(304) 453-1361
625 Oak St
Kenova, WV
 
Lowe's
(304) 736-8900
700 Mall Road
Barboursville, WV
Hours
M-SA 6 am - 10 pm
SU 8 am - 8 pm

LOWE'S OF BARBOURSVILLE, W. VA
304 736-8900
700 MALL ROAD BARBOURSVILLE, WV, 25504
Barboursville, WV
 
Kenny Queen Hardware
(304) 523-2331
4350 A 5th St Rd
Huntington, WV
 
LOWE'S OF BURLINGTON, OH.
740 894-7120
294 COUNTY ROAD 120 S. SOUTH POINT, OH, 45680
South Point, OH
 
Lowe's
(740) 894-7120
294 County Road, 120 South
South Point, OH
Hours
M-SA 7 am - 9 pm
SU 8 am - 7 pm

Huntington Mall
(304) 733-0555
100 Huntington Mall Rd
Barboursville, WV
Store Hours
Sears Stores
Store Type
Sears Stores
Hours
Mon:10-21
Tue:10-21
Wed:10-21
Thu:10-21
Fri:10-21
Sat:10-21
Sun:12-18
Store Features
Mon:10-21
Tue:10-21
Wed:10-21
Thu:10-21
Fri:10-21
Sat:10-21
Sun:12-18

LOWE'S OF RUSSELL, KY
606 329-9469
350 DIEDRICH BOULEVARD ASHLAND, KY, 41101
Ashland, KY
 

Swingin' Storage

Swingin' Storage



I like to store hardware in its original package on a Peg-Board wall in my shop. I've devised some swinging panels for the wall that give me a lot more usable space. To make the panels, you'll need 1/8" Peg-Board, a 3/4" dia. dowel rod, and Peg-Board tool holders.

Make the panels by cutting 12" x 12" pieces from the Peg-Board. For each panel, cut one dowel 2-1/2" long and one 5" long. Cut a 1/8" wide groove in one end of both dowels and slide the dowels onto the panels. Fasten the dowels with screws. 


To install a panel, insert the longer dowel in the top tool holder until the bottom dowel slips into the bottom tool holder. The long top dowel must extend through both rings of the tool holder to keep the panel from falling out. Each pair of tool holders holds up to six panels. 

I also cut a 1/8" wide slot in a 12" length of 2x4 to use as a base for the panels so I can remove a panel from the tool rack and set it on my workbench.

--Mark Thiel



Click here to read the rest of the article from American Woodworker