American Woodworker
Contact Us | Help | Report a Bug
Sign in | Join
 
» » »

Swingin' Storage Lahaina HI

To install a panel, insert the longer dowel in the top tool holder until the bottom;dowel;slips into the bottom tool holder. The long top dowel; must extend through both rings of the tool holder to keep the panel from falling out.

Home Depot Inc
(808) 893-7800
100 Pakaula St
Kahului, HI
 
LAHAINA ACE HARDWARE
(808) 667-5883
LAHAINA SQ - SUITE A, 840 Wainee St
Lahaina, HI
 
Slims Power Tools- Kahului
808-242-7878
142 Kalepa Place Kahului, HI, 96732
Kahului, HI
 
SERVICE RENTALS INC
147 KALEPA PLACE KAHULUI, HI, 96732
Kahului, HI
 
Marmac Ace Hardware
(808) 877-3931
334 Alamaha St
Kahului, HI
 
The Home Depot
(808)893-7800
100 Pakaula Street
Kahului, HI
Hours
Mon-Sat: 6:00am-9:00pm
Sun: 7:00am-7:00pm

Kahului Maui - B
(808) 877-2221
275 Kaahumanu Ave Ste 1000
Kahului Maui, HI
Store Hours
Sears Stores
Store Type
Sears Stores
Hours
Mon:9.5-21
Tue:9.5-21
Wed:9.5-21
Thu:9.5-21
Fri:9.5-21
Sat:9-21
Sun:10-17
Store Features
Mon:9.5-21
Tue:9.5-21
Wed:9.5-21
Thu:9.5-21
Fri:9.5-21
Sat:9-21
Sun:10-17

FKS Rental Sales-Kahului
808-871-7171
441 Alamaha Street Kahului, HI, 96732
Kahului, HI
 
Lowe's
(808) 873-0383
270 Dairy Road, Building A
Kahului, HI
Hours
M-SA 6 am - 9 pm
SU 7 am - 8 pm

Kmart 7488 / Cross Merch
(808) 871-8553
424 Dairy Rd
Kahului, HI
Store Hours
Miscellaneous
Store Type
Miscellaneous
Hours
Mon:8-22
Tue:8-22
Wed:8-22
Thu:8-22
Fri:8-22
Sat:8-22
Sun:8-21
Store Features
Mon:8-22
Tue:8-22
Wed:8-22
Thu:8-22
Fri:8-22
Sat:8-22
Sun:8-21

Swingin' Storage

Swingin' Storage



I like to store hardware in its original package on a Peg-Board wall in my shop. I've devised some swinging panels for the wall that give me a lot more usable space. To make the panels, you'll need 1/8" Peg-Board, a 3/4" dia. dowel rod, and Peg-Board tool holders.

Make the panels by cutting 12" x 12" pieces from the Peg-Board. For each panel, cut one dowel 2-1/2" long and one 5" long. Cut a 1/8" wide groove in one end of both dowels and slide the dowels onto the panels. Fasten the dowels with screws. 


To install a panel, insert the longer dowel in the top tool holder until the bottom dowel slips into the bottom tool holder. The long top dowel must extend through both rings of the tool holder to keep the panel from falling out. Each pair of tool holders holds up to six panels. 

I also cut a 1/8" wide slot in a 12" length of 2x4 to use as a base for the panels so I can remove a panel from the tool rack and set it on my workbench.

--Mark Thiel



Click here to read the rest of the article from American Woodworker