American Woodworker
Contact Us | Help | Report a Bug
Sign in | Join
 
» » »

Swingin' Storage Rome GA

To install a panel, insert the longer dowel in the top tool holder until the bottom;dowel;slips into the bottom tool holder. The long top dowel; must extend through both rings of the tool holder to keep the panel from falling out.

The Home Depot
(706)236-9030
103 Hicks Drive
Rome, GA
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

The Home Depot
(770)606-0298
100 Gentil Street
Cartersville, GA
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

Ace Hardware Of East Rome Inc
(706) 291-1939
1804 Turner Mccall Blvd SW
Rome, GA
 
Mathis Building Supply
(706) 291-1240
22 Shorter Avenue
Rome, GA
 
LOWE'S OF ROME, GA
706 232-6877
2338 SHORTER AVENUE N.W. ROME, GA, 30165
Rome, GA
 
The Home Depot
(678)246-0107
1500 Rome Highway
Cedartown, GA
Hours
Mon-Sat: 7:00am-9:00pm
Sun: 8:00am-7:00pm

Fastenal- Rome
706-802-0270
110 East Eighth Ave Rome, GA, 30161
Rome, GA
 
Kmart 4719 / Cross Merch
(706) 236-9880
102 Hicks Drive
Rome, GA
Store Hours
Miscellaneous
Store Type
Miscellaneous
Hours
Mon:8-22
Tue:8-22
Wed:8-22
Thu:8-22
Fri:8-22
Sat:8-22
Sun:8-21
Store Features
Mon:8-22
Tue:8-22
Wed:8-22
Thu:8-22
Fri:8-22
Sat:8-22
Sun:8-21

600 Mt Berry Sq Ne
(706) 236-2440
2770 Martha Berry Hwy Ne
Rome, GA
Store Hours
Sears Stores
Store Type
Sears Stores
Hours
Mon:10-21
Tue:10-21
Wed:10-21
Thu:10-21
Fri:10-21
Sat:10-21
Sun:12-18
Store Features
Mon:10-21
Tue:10-21
Wed:10-21
Thu:10-21
Fri:10-21
Sat:10-21
Sun:12-18

Lowe's
(706) 232-6877
2338 Shorter Avenue N.W.
Rome, GA
Hours
M-SA 7 am - 10 pm
SU 8 am - 7 pm

Swingin' Storage

Swingin' Storage



I like to store hardware in its original package on a Peg-Board wall in my shop. I've devised some swinging panels for the wall that give me a lot more usable space. To make the panels, you'll need 1/8" Peg-Board, a 3/4" dia. dowel rod, and Peg-Board tool holders.

Make the panels by cutting 12" x 12" pieces from the Peg-Board. For each panel, cut one dowel 2-1/2" long and one 5" long. Cut a 1/8" wide groove in one end of both dowels and slide the dowels onto the panels. Fasten the dowels with screws. 


To install a panel, insert the longer dowel in the top tool holder until the bottom dowel slips into the bottom tool holder. The long top dowel must extend through both rings of the tool holder to keep the panel from falling out. Each pair of tool holders holds up to six panels. 

I also cut a 1/8" wide slot in a 12" length of 2x4 to use as a base for the panels so I can remove a panel from the tool rack and set it on my workbench.

--Mark Thiel



Click here to read the rest of the article from American Woodworker