American Woodworker
Contact Us | Help | Report a Bug
Sign in | Join
 

Vine Trellis College Station TX

Frame the front and back faces of the trellis (Photo 6). Align the beveled ends of the slats with the edges of the legs and drill pilot holes. Then drill out the holes in the slats so the screws slip through. Apply glue and assemble.

The Home Depot
(979)595-1188
1615 University Dr East
College Station, TX
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

Post Oak Mall
(979) 764-0300
1502 Harvey Rd
College Sta, TX
Store Hours
Sears Stores
Store Type
Sears Stores
Hours
Mon:10-21
Tue:10-21
Wed:10-21
Thu:10-21
Fri:10-21
Sat:10-21
Sun:12-18
Store Features
Mon:10-21
Tue:10-21
Wed:10-21
Thu:10-21
Fri:10-21
Sat:10-21
Sun:12-18

The Home Center
(979) 690-6212
14651 Fm 2154
College Station, TX
 
Lowe's
(979) 774-4141
3225 Freedom Blvd.
Bryan, TX
Hours
M-SA 6 am - 10 pm
SU 8 am - 8 pm

Anderson's Family Remodeling
(979) 703-4257
806 Kalanchoe
College Station, , TX
 
Southern Fastening Systems- College Station
979-693-8884
2151 Harvey Mitchell Pkwy S #201 College Station, TX, 77840
College Station, TX
 
Lowe's
(979) 690-4002
4451 Highway 6 South
College Station, TX
Hours
M-SA 7 am - 9 pm
SU 8 am - 7 pm

Ace Of Aggieland, Inc
(979) 696-8500
11907 Wellborn Rd, just south of Koppe Bridge Restaurant
College Station, TX
 
LOWE'S OF BRYAN, TEX.
979 774-4141
3225 FREEDOM BLVD. BRYAN, TX, 77802
Bryan, TX
 
The Home Center
(800) 642-7392
14651 Fm 2154
College Station, TX

Data Provided by:
Data Provided by:

Vine Trellis

Vine Trellis

Before you set aside your push sticks and dust mask for the season, make  something to enjoy all summer. This project takes only about a day to build, once you've got all the materials. It's designed for outdoor use—made from rot-resistant woods and assembled with weatherproof glue and rust-resistant fasteners. Protected with a finish or not, it will enhance your garden or deck for years to come. 

Make any climbing plant happy with this 6-ft. tall, free-standing trellis. We used dadoes, glue and screws to fasten the slats because trellises take a beating each year when you tear off the old vines. We built our trellis from cypress, one of the longest-lasting outdoor woods. Ours was recycled from old water tanks and cost about $175. White oak, at $60, would also be a good choice.

Marking the legs for the dadoes can be confusing, but if you follow our marking procedures (Photos 1 through 4), you can't mess up. Even with our easy-to-make jigs, routing 68 dadoes is noisy, dusty and tedious (Fig. B and Photo 5). But once they're done, the dadoes make assembly foolproof. There's only one angle to remember: Everything slopes 6 degrees.

You'll need an angled template, made with the miter gauge on your tablesaw, to make the dadoing jigs. You'll also need a router with a straight bit to cut the dadoes, and a drill with a slotted tip for all the screws. We used a jointer and planer to mill our parts to thickness, but they could also be ripped to size on a tablesaw. The slats are thin, so be sure to use a push stick.

How To Build It

1) Mill the legs (A) to thickness and cut them to length. 

2) Mark the leg dadoes (Photos 1 through 4 ). The sides of the trellis are tapered, so the dadoes are angled. 

3) Cut an 84-degree angled template, about 10-in. long and at least 4-in. wide. Use it to set the fence angle on the dadoing jigs (Fig. B).
4) Dado the legs (Photo 5). One jig will slope the right direction for the 3/16-in. deep dadoes on one side of each leg. The mirror-image jig will be correct for the other side.

5) Mill slat material to thickness and rip it into lengths, slightly oversize in width. Then plane (or rip) the slats to fit the leg dadoes.

6) Cut the bottom and top slats (B through E) for all four sides to length, with a 6-degree bevel on both ends. You can cut the slats to length in pairs because opposite sides of the trellis are the same.

7) Frame the front and back faces of the trellis (Photo 6). Align the beveled ends of the slats with the edges of the legs and drill pilot holes. Then drill out the holes in the slats so the screws slip through. Apply glue and assemble.

8) Cut the internal slats (F) to fit, and fasten them, following the procedures in Steps 6 and 7.

9) Stand the assembled front and back faces back-to-back in an "A," and assemble the sides, following Steps 7 and 8.

Click here to read the rest of the article from American Woodworker