American Woodworker
Contact Us | Help | Report a Bug
Sign in | Join
 

Vine Trellis Morgantown WV

Frame the front and back faces of the trellis (Photo 6). Align the beveled ends of the slats with the edges of the legs and drill pilot holes. Then drill out the holes in the slats so the screws slip through. Apply glue and assemble.

Hazelton Woodworks
(304) 379-8612
Rt 3 Box 148
ceton Mills, WV

Data Provided by:
Morgantown Mall
(304) 983-6300
9520 Mall Rd
Westover, WV
Store Hours
Sears Stores
Store Type
Sears Stores
Hours
Mon:9.5-21
Tue:9.5-21
Wed:9.5-21
Thu:9.5-21
Fri:9.5-21
Sat:9-21
Sun:11-18
Store Features
Mon:9.5-21
Tue:9.5-21
Wed:9.5-21
Thu:9.5-21
Fri:9.5-21
Sat:9-21
Sun:11-18

General Glass Home Center
(304) 292-3861
5000 Greenbag Road
Morgantown, WV
 
LOWE'S OF S. MORGANTOWN, WV
304 983-3100
9595 MALL ROAD MORGANTOWN, WV, 26501
Morgantown, WV
 
Lowe's
(304) 296-4658
901 Venture Drive
Morgantown, WV
Hours
M-SA 7 am - 9 pm
SU 8 am - 8 pm

The Home Depot
(724)439-6479
115 Matthews Drive
Uniontown, PA
Hours
Mon-Sat: 6:00am-10:00pm
Sun: 8:00am-8:00pm

Morgantown - D
(304) 983-6070
6540 Mall Rd
Morgantown, WV
Store Hours
Miscellaneous
Store Type
Miscellaneous
Hours
Mon:8-22
Tue:8-22
Wed:8-22
Thu:8-22
Fri:8-22
Sat:8-22
Sun:8-21
Store Features
Mon:8-22
Tue:8-22
Wed:8-22
Thu:8-22
Fri:8-22
Sat:8-22
Sun:8-21

Lowe's
(304) 983-3100
9595 Mall Road
Morgantown, WV
Hours
M-SA 7 am - 9 pm
SU 8 am - 8 pm

Ace Hardware & Garden Center
(304) 599-0803
1050 Maple Dr
Morgantown, WV
 
LOWE'S OF MORGANTOWN, W. VA.
304 296-4658
901 VENTURE DRIVE MORGANTOWN, WV, 26508
Morgantown, WV
 
Data Provided by:

Vine Trellis

Vine Trellis

Before you set aside your push sticks and dust mask for the season, make  something to enjoy all summer. This project takes only about a day to build, once you've got all the materials. It's designed for outdoor use—made from rot-resistant woods and assembled with weatherproof glue and rust-resistant fasteners. Protected with a finish or not, it will enhance your garden or deck for years to come. 

Make any climbing plant happy with this 6-ft. tall, free-standing trellis. We used dadoes, glue and screws to fasten the slats because trellises take a beating each year when you tear off the old vines. We built our trellis from cypress, one of the longest-lasting outdoor woods. Ours was recycled from old water tanks and cost about $175. White oak, at $60, would also be a good choice.

Marking the legs for the dadoes can be confusing, but if you follow our marking procedures (Photos 1 through 4), you can't mess up. Even with our easy-to-make jigs, routing 68 dadoes is noisy, dusty and tedious (Fig. B and Photo 5). But once they're done, the dadoes make assembly foolproof. There's only one angle to remember: Everything slopes 6 degrees.

You'll need an angled template, made with the miter gauge on your tablesaw, to make the dadoing jigs. You'll also need a router with a straight bit to cut the dadoes, and a drill with a slotted tip for all the screws. We used a jointer and planer to mill our parts to thickness, but they could also be ripped to size on a tablesaw. The slats are thin, so be sure to use a push stick.

How To Build It

1) Mill the legs (A) to thickness and cut them to length. 

2) Mark the leg dadoes (Photos 1 through 4 ). The sides of the trellis are tapered, so the dadoes are angled. 

3) Cut an 84-degree angled template, about 10-in. long and at least 4-in. wide. Use it to set the fence angle on the dadoing jigs (Fig. B).
4) Dado the legs (Photo 5). One jig will slope the right direction for the 3/16-in. deep dadoes on one side of each leg. The mirror-image jig will be correct for the other side.

5) Mill slat material to thickness and rip it into lengths, slightly oversize in width. Then plane (or rip) the slats to fit the leg dadoes.

6) Cut the bottom and top slats (B through E) for all four sides to length, with a 6-degree bevel on both ends. You can cut the slats to length in pairs because opposite sides of the trellis are the same.

7) Frame the front and back faces of the trellis (Photo 6). Align the beveled ends of the slats with the edges of the legs and drill pilot holes. Then drill out the holes in the slats so the screws slip through. Apply glue and assemble.

8) Cut the internal slats (F) to fit, and fasten them, following the procedures in Steps 6 and 7.

9) Stand the assembled front and back faces back-to-back in an "A," and assemble the sides, following Steps 7 and 8.

Click here to read the rest of the article from American Woodworker